| |
|
|
|
|
|
|
|
 |
|
Information Commons, Burlington, VT: A new 4-story, 30,000-square-foot facility housing information technology connected with world-wide electronic databases, multi-media laboratories, and specialized electronic classrooms |
|
 |
|
Main Street Suites and Conference Center, Burlington, VT: A new, 30,000-square-foot facility including meeting space, lounge, and underground parking; this project was the recipient of a Historical Society Preservation Award |
|
| |
|
|
|
|
|
|
|
 |
|
Center for Global Business and Technology, Burlington, VT: A new 23,000-square-foot, three-story building with glass-walled classrooms, open space, skylights, and dormers to reduce energy consumption |
|
 |
|
IDX Student Life Complex, Burlington, VT: A new 40,000-square-foot facility housing dining and kitchen facilities, a fitness center, and a full-sized gym
> View Case Study |
|
| |
|
|
|
|
|
|
|
 |
|
Juniper Hall, Burlington, VT: A new 90-bed, 30,000-square-foot residence hall |
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Student Center, Potsdam, NY: A new 57,000-square-foot student center including a TV station, radio station, kitchen servery, bar, virtual game room, 240-seat forum, multi-purpose rooms, meditation room, convenience store, and a multi-cultural international room; this project is pursuing LEED Silver. |
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Central Heating Plant Expansion, Waterville, ME: An expansion of the Central Heating Plant to house new biomass equipment and appurtenances; this project is pursuing a LEED Certified rating |
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Campus Work, Hanover, NH: For over 30 years, PC Construction has partnered with Dartmouth College on 15 campus projects |
|
 |
|
Andrews, Zimmerman, Morton Dormitory Renovations, Hanover, NH: The fast-track renovation of three dormitory buildings totaling 65,000 square feet and 188 beds in just 10 weeks |
|
| |
|
|
|
|
|
|
|
 |
|
Central Chilled Water Plant and Upgrade, Hanover, NH: Construction of a new chilled water plant and upgrade to existing facilities, including installation of two 800 nominal ton steam absorption water chillers, two 650-ton chillers, two 38,700 MBH induced draft counter-flow cooling tower cells and ancillary equipment and system modifications |
|

|
|
Buchanan Hall Dorm Renovations for Tuck School of Business, Hanover, NH: A 27,000-square-foot renovation to an existing 4-story building to serve as office and residential space, including new plumbing, mechanical and electrical systems, and elevator as well as an entryway addition, enclosed connector, selective demolition, and asbestos abatement |
|
| |
|
|
|
|
|
|
|
 |
|
New Hampshire Hall Dorm Renovations, Hanover, NH: A renovation to an existing 120-bed residence hall including two additions to enclose external steel stair towers, upgrades to the mechanical, electrical, and plumbing systems, and new bathrooms, student kitchens, and windows. |
|
 |
|
Hitchcock Hall Dorm Renovations, Hanover, NH: A complete interior and exterior renovation of an existing 28,000-square-foot, 4-story residence hall, including life safety and ADA compliance upgrades, new mechanical, electrical, and plumbing systems, and a new elevator and shaft |
|
| |
|
|
|
|
|
|
|
 |
|
Boiler No. 2 Replacement, Hanover, NH: The replacement of the existing boiler with a new 75,000 lb./hr. boiler as well as renovations to the existing steam plant and replacement of the existing 100-year old roof |
|
 |
|
Burke Hall Chiller Plant Upgrade & Heat Recovery, Hanover, NH: A 3-phase project including the interconnection between the Central CHW plant and the new chillers in Burke Hall, revisions to laboratory and building exhaust system to provide heat recovery, and replacement of steam absorption chillers with electric centrifugal chillers |
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Miller Humanities Center, Meriden, NH: A 23,000-square-foot complete renovation to the existing student center into the primary classroom and faculty space for the Academy's Humanities Department as well as a library |
|
 |
|
Field House, Meriden, NH: Demolition of a partially-constructed structure and construction of a 40,000-square-foot indoor athletic field |
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Central Maine Community College New Residence Hall, Auburn, ME: A new design/build four-story, 27,000-square-foot, 148-bed residence hall that was delivered in just 10 months |
|
 |
|
Eastern Maine Community College New Residence Hall, Bangor, ME: A new design/build four-story, 30,000-square-foot, 163-bed residence hall |
|
| |
|
|
|
|
|
|
|
 |
|
Southern Maine Community College New Residence Hall, South Portland, ME: A new design/build four-story, 61,000-square-foot, 324-bed residence hall designed to complement the look and feel of the historic neighborhood |
|
 |
|
Southern Maine Community College Brunswick Campus Renovations, Brunswick, ME: 131,000 square feet of renovations within five buildings |
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
McCullough Student Center Renovations, Middlebury, VT: The renovation and upgrade of four levels of existing student activity space, including a new stage, actors’ and gym spaces, as well as mechanical, electrical, and ADA compliance upgrades
> View Case Study
|
|
 |
|
Mahoney Center for the Arts Renovations, Middlebury, VT: Fast-track summer renovation of 7,600 square feet of existing music library space into classroom and office space
|
|
| |
|
|
|
|
|
|
|
 |
|
Mahoney Box Office, Middlebury, VT: Construction of a ticket box office within the existing Mahoney Center of the Arts; project completed by PC’s Special Projects Group
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Amen Hall Dormitory Restoration, Exeter, NH:The fast-track renovation and restoration of an existing 5-story, 25,000-square-foot, 32-bed dormitory |
|
 |
|
Cilley Hall Dormitory Renovation, Exeter, NH: A fast-track renovation of an existing 4-story, 31,000-square-foot, 48-bed dormitory |
|
| |
|
|
|
|
|
|
|
 |
|
Peabody Hall Dormitory Renovations, Exeter, NH:The fast-track renovation of a 4-story, 20,000-square-foot, 39-bed dormitory |
|
 |
|
Phelps Science Center, Exeter, NH: A new 83,000-square-foot, 4-story building with an auditorium, 24 classroom laboratories, and 4 common laboratories, all used for the teaching of physics, biology, chemistry, general science, and computer science |
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Cashman, Canterbury and Pontigny Halls, Colchester, VT: Three new 3-story, 33,000-square-foot residence halls totaling 380 beds |
|
 |
|
Pomerleau Alumni Center, Colchester, VT: A new 2-story, 6,500-square-foot alumni center with a kitchen, offices, and function space; this project achieved LEED Silver |
|
| |
|
|
|
|
|
|
|
 |
|
Student Center and Residential Hall, Colchester, VT: A new 3-story, 40,000-square-foot student center and 4-story, 43,000-square-foot, 105-bed residence hall |
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Renovations and Additions, South Portland, ME: A 137,000-square-foot renovation and 174,000-square-foot expansion within an occupied high school |
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Colvin Hall Dorm Renovations, Orono, ME: Over 19,000 square feet of renovations to the 2nd and 3rd floors of this 70-bed residence hall and the renovation of the 4th floor unfinished attic to create a student study area and guest suite |
|
 |
|
Engineering and Science Research Center, Orono, ME: A new laboratory and research facility with 60 laboratories, a Class 100 clean room, research space, an auditorium, faculty offices, and a mechanical penthouse |
|
| |
|
|
|
|
|
|
|
 |
|
Collins Center for the Arts and Hudson Museum, Orono, ME: The renovation and upgrade of the former Maine Center for the Arts, including a new entry pavilion, new egress stairs, ADA compliant passenger elevator and toilets, and the demolition and remodel of associated support spaces and existing museum and lounge |
|
 |
|
Student Recreation and Fitness Center, Orono, ME: Construction of new 86,000-square-foot, two-story recreation and fitness center with four gyms, pool, elevated indoor jogging track, multi-purpose rooms, racquetball and basketball courts, multi-purpose court, and locker rooms, as well as an administration suite, lounge, and support area; this is a LEED Silver project |
|
| |
|
|
|
|
|
|
|
 |
|
Memorial Gym and Field House Renovation, Orono, ME: Renovation of two adjoining buildings, including life-safety, ADA accessibility, structural, ventilation, and electrical, as well as replacement of the track and athletic floor surfaces and roof |
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Paul College of Business and Economics, Durham, NH:A new 115,000-square-foot academic facility with over 800 instructional seats in 16 classrooms, a 200-seat auditorium, 25 high-tech group study rooms, a 2-story great hall, and dedicated space for a hospitality room, career services, and administration space; this project is pursuing LEED Gold |
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Student Residential Learning Complex at University Heights, Burlington, VT: Six new four-story buildings comprising 258,000 square feet and 800 beds in addition to faculty and complex administrator living areas, support spaces, lounges, a multi-purpose room, game rooms, and a partial basement for mechanical areas; this is a LEED Gold project |
|
 |
|
Living and Learning Housing Center Renovations, Burlington, VT: The fast-track dormitory renovations of five three-story residential buildings totaling 540 beds was completed over three summers; project completed in conjunction with PC's Special Projects Group |
|
| |
|
|
|
|
|
|
|
 |
|
Gutterson Fitness Center, Burlington, VT: A 32,000-square-foot addition to the existing fitness center including new roof and refrigeration equipment for the ice rink, olympic-sized swimming pool, auxiliary gym, new locker rooms, and racquetball courts |
|
 |
|
Health Science Research Facility, Burlington, VT: A new 125,000-square-foot, multi-story, state-of-the-art health science research facility including a cancer center, genetics laboratories, laboratory support spaces, conference rooms, laboratory offices, and administrative space |
|
| |
|
|
|
|
|
|
|
 |
|
George D. Aiken Center Expansion & Renovation, Burlington, VT: The renovation of 37,000 square feet of a three-story building and construction of a new 2,300 square foot solarium; this project is pursuing LEED Platinum |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|