Pre-Outfit 2 Building Modifications, Bath, ME: The demolition of a 200' x 140' portion of an existing high-bay shipyard assembly building and construction of a new addition measuring 282' x 236' x 106' tall |
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Building Core and Shell, Lebanon, NH: A 21,500-square-foot, one story biological laboratory research facility |
|
 |
|
Building Fit-up, Lebanon, NH: Fit-up of 21,500 square feet of laboratory and support space for use by Dartmouth College’s Biology Department |
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Bolton Falls Timber Crib Dam Repair, Duxbury, VT: The installation of a temporary cofferdam and dewatering of the head pond to remove and replace the existing timber crib dam; project completed by PC's Special Projects Group |
|
 |
|
Essex #19 Dam Repair, Essex, VT: The repair of over 300-square-feet of dam facing, including demolition and associated concrete work; project completed by PC's Special Projects Group |
|
| |
|
|
|
|
|
|
|
 |
|
Vergennes Hydro #19 Unit #1, Vergennes, VT: The demolition of an existing turbine and support bridge and installation of a new one megawatt turbine with ancillary items, and structural steel support bridge, in addition to rewiring the existing generator, electrical, and controls; project completed by PC's Special Projects Group |
|
 |
|
Essex Hydro Minimum Flow Unit, Essex, VT: The demolition of an existing turbine and installation of a new .85 megawatt turbine with ancillary items, penstock, electrical, and controls; project completed by PC's Special Projects Group |
|
| |
|
|
|
|
|
|
|
 |
|
Essex #19 Diesels, Essex, VT: The demolition of existing generators and installation of four new two megawatt diesel generators; project completed by PC's Special Projects Group |
|
 |
|
Marshfield Penstock Replacement, Marshfield, VT: The replacement of three miles of 60-inch penstock over a three-year period; project completed by PC's Special Projects Group
> View Case Study
|
|
| |
|
|
|
|
|
|
|
 |
|
Middlesex Hydro Plant #2 Dam Spillway Repairs, Middlesex, VT: The removal and replacement of 2,000 square feet of concrete facing on the downstream side of the dam; project completed by PC's Special Projects Group |
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Hot Runner Facility, Milton, VT: A new 200,000-square-foot manufacturing facility on a 750-acre site |
|
 |
|
Tool Foundations, Milton,
VT: A modification to the existing foundation to provide additional structural support for new manufacturing tool placements |
|
| |
|
|
|
|
|
|
|
 |
|
Plate Line Addition, Milton, VT: An 18,000-square-foot addition |
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Sustaining Work Contracts, New York and Vermont Sites: Preconstruction and construction management services including feasibility studies, procurement and management of design services, projects ranging in size and scope including tool installs, office and cafeteria modifications, testing and packaging facilities, clean room modifications and upgrades, laboratory renovations, and utility and system upgrades |
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Research & Manufacturing Renovation and Expansion, Westbrook, ME: A fast-track, multi-phased 210,000-square-foot manufacturing addition including the demolition of a 160,000-square-foot building and renovation to 70% of the existing space |
|
 |
|
Water Manufacturing, Westbrook, ME: An 8,785-square-foot, two-phase expansion of the water quality testing facility |
|
| |
|
|
|
|
|
|
|
 |
|
East Building Phase I, Westbrook, ME: A 3-story, 108,000-square-foot addition housing office space, a wellness center, conference rooms, and cafeteria; this project is pursuing LEED Silver |
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Bioinformatics Expansion, Bar Harbor, ME: A three-story addition with office and conference space to support the expansion of their Bioinformatics Biology program |
|
 |
|
Utility Plant Upgrade, Bar Harbor, ME: Construction of a new 1200 horsepower biomass-fired utility plant utilizing a wood-powder suspension combustion technology |
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Manufacturing Facility, Brunswick, ME: A new 79,000-square-foot state-of-the-art facility including a clean production area, warehouse, two-story office building, and various support space |
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Plant Expansion, St. Albans, VT: A 3-story, 94,000-square-foot pharmaceutical manufacturing facility on an existing campus with ongoing manufacturing processes |
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
PurposeEnergy Anaerobic Digester, South Burlington, VT: A design-build project involving the construction of a 2 billion BTU digester facility adjacent to the existing Magic Hat Brewing Co.; the patented digester design creates methane from the remnants of the brewing process and uses it to power the brewery's boiler and other systems that traditionally run on natural gas; project completed by PC's Special Projects Group
> View Case Study
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
National Cold Water Marine Aquaculture Facility, Franklin, ME: A new 40,000-square-foot aquaculture center with wet lab space, fish containment rooms, water treatment rooms, material/waste locks, effluent treatment building, two research tank out-buildings, and specialized aquaculture tanks, systems, and piping for Atlantic Salmon research and development
> View Case Study
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
BM2 Addition, St. Johnsbury, VT: A 38,000-square-foot addition to an existing facility as well as the installation of a horizontal hot press and associated equipment, relocation of wet end equipment, and modifications to the dry end transport equipment; project completed in conjunction with PC's Special Projects Group |
|
 |
|
LAM Line, St. Johnsbury, VT: Reconfiguration of an existing process line during a critical 3-week shutdown; project completed by PC’s Special Projects Group |
|
| |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
 |
|
Winooski One Hydroelectric Facility, Winooski, VT: This project included the design and construction of a 7.2 MW hydroelectric facility |
|
 |
|
Rubber Dam Removal, Winooski, VT: Demolition of a portion of the existing 150-linear-foot spillway and installation of measures to improve longevity of new rubber dam. to perform this work, a temporary bridge was constructed over the roof of the powerhouse and along the downstream face of the dam for use as a crane platform; project completed by PC’s Special Projects Group |
|
| |
|
|
|
|
|
|
|
 |
|
Sustaining Contract, Springfield and East Montpelier, VT – Work includes yearly plant mechanical maintenance; unit teardown for inspection and maintenance; trashrack/trashraker maintenance, etc.; services provided by PC’s Special Projects Group |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|