FEATURED PROJECTS

Water Treatment Construction

 

PC Construction has been a leader in the water treatment field for over 50 years. Here are a few examples of facilities that benefited from our quality competitive bid and integrated delivery solutions. CLICK A PROJECT TITLE BELOW TO LEARN MORE.

spacer

Abingdon Water Treatment Plant

               
Abingdon Water Treatment Plant Expansion, Abingdon, MD  

Abingdon Water Treatment Plant Expansion, Abingdon, MD: An expansion of the existing facility from 40 to 50 mgd
> View Case Study

         
               

Airport Parkway Wastewater Treatment Facility

               
Airport Parkway Wastewater Treatment Facility Upgrade & Expansion, South Burlington, VT




 

Upgrade & Expansion, South Burlington, VT: An upgrade of the existing facility from 2.3 to 3.3 mgd; the improvements will lower power consumption and use biogas from the digestion process to fuel a cogeneration unit to heat and power the plant

         
               

Atlantic Treatment Plant

               
Atlantic Treatment Plant Expansion Phase 1, Contract C, Virginia Beach, VA   Expansion Phase 1, Contract C, Virginia Beach, VA: An expansion and upgrade of the existing wastewater treatment plant from 36 to 54 mgd          
               

Blue Plains Advanced Wastewater Treatment Plant

               
Blue Plains Advanced Wastewater Treatment Plant ENR First Contract Slurry Wall and Tankage, Washington, DC   ENR First Contract Slurry Wall and Tankage, Washington, DC: Construction of Denitrification Reactors and associated channels, Post Aeration Tanks, Flow Distribution Chambers, Dual Sedimentation Flume Junction Box, Nitrification East Effluent Connector and Effluent Channels.  The project’s major concrete work includes 8,400 tons of rebar and approximately 80,000 cubic yards of concrete as well as placement and compaction of approximately 105,000 cubic yards of excavation and backfill   Blue Plains Advanced Wastewater Treatment Plant Main Process Train, Washington, DC   Main Process Train / Cambi, Washington, DC: Modifications to the existing facility to incorporate Cambi’s Thermal Hydrolysis Process into the operating facility; this will be the first treatment plant facility in the U.S. to utilize this Cambi technology  
               
Blue Plains Advanced Wastewater Treatment Plant ENR First Contract Slurry Wall and Tankage, Washington, DC   Final Dewatering Facility, Washington, DC: A new 3-story building housing16 new Belt Filter Presses to expand dewatering capacity and efficiency of dewatering Class A  thermally hydrolyzed-digested biosolids          
               

Broad Run Water Reclamation Facility

               
Broad Run Water Reclamation Facility Multiple Contracts, Ashburn, VA   Multiple Contracts, Ashburn, VA: A new 10 mgd advanced wastewater treatment plant, 15 mgd water booster pumping station with associated appurtenances, piping, valves, controls, and site improvements, and influent pumping station          
               

Columbia Water Treatment Plant

               
Columbia Canal Water Treatment Plant Columbia Canal WTP, Columbia, SC   Columbia Canal WTP, Columbia, SC: A new Raw Water Pump Station and the complete renovation of High Service Pump Station #1          
               

Corbalis Water Treatment Plant

               
Corbalis Water Treatment Plant Ozone System, Herndon, VA   Ozone System, Herndon,
VA:
Addition of three 1,000 lb./day ozone generators and associated piping, valves, and equipment, as well as structural modifications to existing plant to accommodate the new cooling towers and chillers
  Corbalis Water Treatment Plant Phase III, Herndon, VA   Phase III, Herndon, VA: An upgrade of the existing facility from 150 to 225 mgd  
               

F. Wayne Hill Water Resources Center

               
F. Wayne Hill Water Resources Center Upgrade and Expansion, Buford, GA   Upgrade and Expansion, Buford, GA: An upgrade of the existing wastewater treatment plant from 20 to 60 mgd          
               

H.L. Mooney Water Reclamation Facility

               
H.L. Mooney Water Reclamation Facility Wastewater Treatment Plant, Woodbridge, VA   Wastewater Treatment Plant, Woodbridge, VA: An expansion and upgrade of the existing facility from 12 to 18 mgd and the addition of solids/sludge management systems, including highly complex mechanical dewatering equipment, pumps, and a fluidized bed incinerator   H.L. Mooney Water Reclamation Facility Expansion Phases I – IV, Woodbridge, VA   Expansion Phases I – IV, Woodbridge, VA: An expansion and upgrade of the existing facility from 12 to 18 mgd and modifications and upgrades to existing structures including aeration basins, secondary clarifier, pump station, solids processing building, incinerator, and sludge storage tank  
               
H.L. Mooney Water Reclamation Facility Expansion and Upgrade Stage 2, Woodbridge, VA   Expansion and Upgrade Stage 2, Woodbridge, VA: Expansion of existing facilities and systems from 18 to 24 mgd including several new structures          
               

Hopewell Water Treatment Plant

               
Hopewell Water Treatment Plant Improvements, Hopewell, VA   Water Treatment Plant Improvements, Hopewell, VA: Design/build improvements to an existing facility, including additions to the Domestic Filter, GAC Carbon Contactor, and Pre-Chemical and Office Buildings, as well as a new Industrial Filter Building and 2.5 MM pre-stressed concrete clear well tank          
               

Tupelo Bayou WWTP

               
Tupelo Bayou WWTP Plant Improvements, Conway, AR   Plant Improvements, Conway, AR: A new 16 mgd wastewater treatment plant featuring an activated sludge treatment system, U.V. disinfection, and anaerobic sludge digestion with gas recovery          
               

Upper Occoquan Service Authority

               
Upper Occoquan Sewage Authority Carbon Regeneration Furnace, Centreville, VA   Carbon Regeneration Furnace, Centreville, VA: Improvements to existing facilities including a new carbon regeneration furnace with ancillary systems; upon completion of construction, the plant will be able to produce 12,000 pounds of reactivated carbon per day   Upper Occoquan Sewage Authority Primary Clarifiers, Odor Control & Hydraulic Improvements Contract 4, Centreville, VA   Primary Clarifiers, Odor Control & Hydraulic Improvements Contract 4, Centreville, VA: Improvements to install a sixth primary clarifier, odor control system, and hydraulic improvements as well as replacement of three primary clarifiers  
               
Upper Occoquan Sewage Authority Nutrient Compliance Facilities, Centreville, VA   Nutrient Compliance Facilities, Centreville, VA: Modifications to Aeration Basins, Mixed Liquor Channel, Secondary Clarifiers, Biofoam Pump Stations, and the RAS Pump Station in addition to new instrumentation systems and Centrate Equalization Pump Station   Upper Occoquan Sewage Authority Rotary Dryer System, Centreville, VA   Rotary Dryer System, Centreville, VA: Installation of a natural gas-fired triple drum Rotary Drum Dryer for drying and pelletizing sludge; the unit will provide an average of 92% dry solids Class A biosolids  
               
Upper Occoquan Sewage Authority ESCO Cogeneration, Centreville, VA   ESCO Cogeneration, Centreville, VA: Design-build energy improvements including a new cogeneration system with two 350kW generators fueled by digester methane gas and the replacement of the existing 600 hp blowers with high-speed gearless turbo blowers          
               

Yellow River Water Reclamation Facility

               
Yellow River Water Reclamation Facility Water Reclamation Facility Improvements, Lilburn, GA  

Water Reclamation Facility Improvements, Lilburn, GA: An expansion of the existing facility from 12.5 to 22 mgd with dramatic improvements to the effluent quality and complete replacement of the existing plant’s wastewater treatment process
> View Case Study

> Read the full story