Broad Run WRF Contracts 2 and 3

The first facility in Virginia to use membrane technology.

Location
Ashburn, VA
Delivery Method
Design-Bid-Build
Client
Loudoun Water
Year Complete
2008

Project Overview

This new 10-mgd advanced wastewater treatment plant was the first in Virginia to use membrane technology. In addition to the GE membrane technology, the project features two 50-foot-diamter, 82,000-cubic-foot Crom® Digesters with HDPE lining, screen and grit building, fine screen building and a biological reactor basin blower building.

Additional buildings include a carbon treatment, UV disinfection and a thickening and dewatering building. Four dewatering centrifuges rated at 1.1 dry tons per hour were installed as was a new emulsion polymer system with three progressive cavity feed pumps.

164K

Total Cubic Feet of Crom® Digesters

7,000

Cubic Yards of Rock Excavation and Removal

80%

Contract Value Self-Performed by PC