Brunswick WWTF Upgrade Phase 1

First treatment plant in Maine to utilize CM at-Risk project delivery.

Domes
Location
Brunswick, ME
Delivery Method
CM at-Risk
Client
Brunswick Sewer District
Year Complete
2019
Region
Northeast

Project Overview

This $18 million project, the first CM at-Risk treatment plant project in Maine, replaced equipment and systems at the end of their useful lives while improving plant efficiency and reducing long-term operating costs.

Construction included two maintenance facility buildings; a headworks building; replacement of the influent junction structure and sludge dewatering system; upgrades to the existing headworks area and septage receiving, disinfection system, sludge holding tanks, odor control system, plant water system and alkalinity/PH adjustment system; modifications to primary effluent pumping system; and improvements to structural, architectural, mechanical, electrical, SCADA and instrumentation systems.

$2M

Project Savings Without Scope Reduction

60%

Contract Value Self-Performed by PC

1st

CM at-Risk Delivery of a Treatment Plant in Maine

Our Clients

We are both pleased and impressed with PC’s preconstruction team’s professionalism, acumen and teamwork. Their team has shown us that they truly understand how to work in the spirit of cooperation and partnership with their client.

Rob Pontau

General Manager • Brunswick Sewer District