Palm Coast WWTP No. 2

Production of treated water suitable for reuse.

Location
Palm Coast, FL
Delivery Method
Design-Bid-Build
Client
City of Palm Coast, FL
Year Complete
2018
Region
Southeast

Project Overview

This new 2-mgd wastewater treatment plant, located on a 15-acre greenfield site, includes a new membrane bioreactor (MBR) treatment facility with added reclaimed water storage capacity. Numerous technological advances are incorporated into the design that allow for the production of treated water suitable for reuse, reducing the use of potable water for irrigation and the rate of groundwater withdrawal.

Work included new headworks with screening, grit removal, odor control facilities, chlorine contact tanks, sewage and reclaimed water pumping facilities, sludge holding tanks and sludge dewatering facilities.

15

Acre Greenfield Site for Wastewater Treatment

2

MGD Reclaimed Water Storage Capacity

64%

Contract Value Self-Performed by PC