Port Royal Island WRF
A new treatment plant to meet community need.
- Location
- Port Royal, SC
- Delivery Method
- CM at-Risk
- Market
- Water / Wastewater
- Client
- Beaufort-Jasper Water & Sewer Authority
- Year Complete
- 2006
- Region
- Southeast
Project Overview
This fast-track project, located on a greenfield site, delivered a new 4.5-mgd wastewater treatment plant, expandable to 7.2 mgd. Construction included preliminary and secondary treatment structures, headworks, aeration basins, a clarifier splitter box, secondary clarifiers, an effluent structure, an RAS control structure and a RAS/WAS pump station. The project also included the installation of a UV disinfection system, construction of a sludge dewatering building with belt filter presses and a new administration and controls building.
$25.5M
Construction Project Contract Value
$750K
Total Construction Project Savings
70
Contract Value Self-Performed by PC