Preserving history while building for the future.

Brick Building with Architectural Glass Window
Location
Burlington, VT
Delivery Method
Design-Bid-Build
Client
University of Vermont
Year Complete
2017
Region
Northeast

Project Overview

Construction of the 3,000-square-foot addition to the historic central plant created an entirely new front facade along with a new curved masonry wall enclosure to conceal the new and existing cooling towers. Work also included installation of a 1,500-ton electric centrifugal chiller with associated pumps, equipment and piping systems; new electrical supply and switchgear, including a major underground ductbank; extensive underground utility relocations; and a major telecommunications vault in the footprint of the expansion –all with no interruptions to ongoing operations. The addition also included infrastructure and floor space to house a future chiller.

3,000

Square-Foot Central Plant Addition

1,500

Ton Electric Centrifugal Chiller Installation

16

Month Construction Project Schedule